Construction & Construction Management
-
0Abberton Reservoir Scheme
To meet water resource requirements in the future, Essex & Suffolk Water implemented a scheme to increase the storage capacity at their existing reservoir at Abberton, from 26 to 41 billion liters of water. The scheme was designed to minimise impact on the environment and improve amenity and ecological habitats.
-
0AMP Hydropower Projects - Cannelton, Smithland, Willow Island, Meldahl
MWH Global is engineering the largest deployment of clean, renewable run-of-river hydroelectric generation in the U.S. MWH Global was selected by AMP in 2007 to serve as Owner’s Engineer for the design and construction management of four new hydroelectric projects at existing Federal dams on the Ohio River. MWH is concurrently providing resident engineering during the […]
-
0Bamford WTW - Treatment Enhancements Project
Increasing raw water color from the reservoir catchments, associated with higher intensity rainfall events (believed to be linked with global warming), have put the existing clarification processes under increasing challenge. In order to future proof the works against this, a substantial enhancement project has been undertaken over the past three years (2009 to 2012). A […]
-
0Birmingham Bio Power Tyseley Resource Recovery Center
The Birmingham Bio-Power plant in Tyseley, just outside Birmingham, will provide 9MWe (net) of renewable electricity to the national grid. This power will be eligible for Renewable Obligations Certificates under the UK government’s renewables incentive scheme. The project has been developed by Carbonarius Ltd, a successful private developer of local power production facilities. Birmingham Bio-Power […]
-
0Brighton & Hove WwTW Scheme
The Southern Water Brighton and Hove wastewater treatment works treats the 95 million litres of wastewater generated each day in the catchment area of Brighton and Hove to the required European standards. After treatment, the water is returned to the environment 2.5 kilometres off-shore.
-
0Central Weber Wastewater Treatment Plant Upgrade
This $135 million project includes engineering, design and construction management/general contractor services to design and construct a new 30-mgd activated-sludge treatment plant as an expansion to the existing facility, including all civil, structural, mechanical, electrical, instrumentation, commissioning and start up.
-
0Cerro Corona
The Cerro Corona Mine is located within a mineral rich trend in the Hualgayoc mining district of the Andes mountain range and is owned and operated by Gold Fields, one of the world’s largest gold producers. When completed, Cerro Corona will be a single surface mine producing approximately 91 million tons of ore mined over […]
-
0Chacayes Hydropower Project / Construcción Central Hidroeléctrica Chacayes
The Chacayes Hydropower Project reduces the country’s dependence on fossil fuels while providing 300,000 homes with clean, renewable energy. MWH provided detailed engineering design services for the 111 MW Chacayes run-of-river hydroelectric project, located in the Alto Cachopoal Valley of the Andes Mountains in Chile’s central region. Located on the Cachapoal and Cipreses rivers, The […]
-
0City of Cape Coral Facility/Utility Expansion (FEP/UEP) Program
In 2001, Cape Coral city officials prepared a comprehensive utility master plan to keep pace with increasing demands in one of the country’s fastest growing cities. A major part of the City’s program was a design/CM-at-Risk Utility Expansion Program (UEP) that added 720 miles of water, gravity sewer and irrigation pipelines, 240 miles of residential […]
-
0Coleshill STW
Coleshill STW Phase two consisted of building of a new Inlet works to provide accurate control of flow to preliminary and full treatment, satisfactory screening capacity, and accurate inlet works flow measurement and satisfactory grit removal.