Markets
-
0Central Valley Flood Management Planning Program
MWH successfully led the on-time completion of the first-ever, State of California Central Valley Flood Protection Plan (CVFPP). Adopted June 29, 2012, by a unanimous vote of the state’s Central Valley Flood Protection Board (Board), the 2012 CVFPP provides a comprehensive plan to modernize a flood management system that protects more than one million people […]
-
0Central Weber Wastewater Treatment Plant Upgrade
This $135 million project includes engineering, design and construction management/general contractor services to design and construct a new 30-mgd activated-sludge treatment plant as an expansion to the existing facility, including all civil, structural, mechanical, electrical, instrumentation, commissioning and start up.
-
0Centroc Carbon Plus Study and Water Security Study
Centroc represents sixteen local governments of Central NSW and exists to provide advocacy services for the region. The Centroc local governments are spread across the Upper Lachlan Valley and the Macquarie River. These two rivers have been in severe drought for most of the current decade. Water supply security has been identified by Centroc as […]
-
0Cerro Corona
The Cerro Corona Mine is located within a mineral rich trend in the Hualgayoc mining district of the Andes mountain range and is owned and operated by Gold Fields, one of the world’s largest gold producers. When completed, Cerro Corona will be a single surface mine producing approximately 91 million tons of ore mined over […]
-
0Chacayes Hydropower Project / Construcción Central Hidroeléctrica Chacayes
The Chacayes Hydropower Project reduces the country’s dependence on fossil fuels while providing 300,000 homes with clean, renewable energy. MWH provided detailed engineering design services for the 111 MW Chacayes run-of-river hydroelectric project, located in the Alto Cachopoal Valley of the Andes Mountains in Chile’s central region. Located on the Cachapoal and Cipreses rivers, The […]
-
0Christchurch Earthquake Reinstatement Program
The Canterbury earthquakes of 2010 and 2011 have had a major economic impact on the region and on New Zealand. The earthquakes rank as one of the costliest natural disasters for insurers worldwide since 1950. The Christchurch rebuild will cost the equivalent of around 10 percent of Gross Domestic Product (GDP). With continuing aftershocks, damage […]
-
0City Financial Services for Wyoming City
One of the oldest cities in Wyoming is faced with aging water and sewer infrastructure in need of repair. For example, during line replacement projects, workers found wooden pipes that were still in service. Needless to say, there is substantial cost and work required to upgrade the system to meet the rigors of Wyoming winters […]
-
0City of Cape Coral Facility/Utility Expansion (FEP/UEP) Program
In 2001, Cape Coral city officials prepared a comprehensive utility master plan to keep pace with increasing demands in one of the country’s fastest growing cities. A major part of the City’s program was a design/CM-at-Risk Utility Expansion Program (UEP) that added 720 miles of water, gravity sewer and irrigation pipelines, 240 miles of residential […]
-
0Coleshill STW
Coleshill STW Phase two consisted of building of a new Inlet works to provide accurate control of flow to preliminary and full treatment, satisfactory screening capacity, and accurate inlet works flow measurement and satisfactory grit removal.
-
0Consolidation Feasibility Study for Rocky Mountain Region Utility
With their wastewater treatment plant operating at capacity and drinking water source of supply drying up, one Colorado utility was presented with a series of serious challenges and one important question: Should they forge ahead alone or attempt to enter into a regional solution with their neighbor? Going at it alone would require the utility, […]
English
Dutch
Turkish