Americas
-
0Albany Park Stormwater Diversion Tunnel
Construction will begin for a stormwater diversion tunnel that MWH was retained to design in order to alleviate the chronic, damaging flooding in the Albany Park neighborhood in the City of Chicago.
-
0Alewife Reservation Stormwater Wetland
Since 1998, MWH has been engaged by the Cambridge Department of Public Works to engineer a sewer separation project in Massachusetts. The sewer separation project lies within the Alewife Brook watershed, features an engineered storm water wetland. The wetland was completed in October 2013 as part of $117 million in ongoing construction that will reduce […]
-
0AMP Hydropower Projects - Cannelton, Smithland, Willow Island, Meldahl
MWH Global is engineering the largest deployment of clean, renewable run-of-river hydroelectric generation in the U.S. MWH Global was selected by AMP in 2007 to serve as Owner’s Engineer for the design and construction management of four new hydroelectric projects at existing Federal dams on the Ohio River. MWH is concurrently providing resident engineering during the […]
-
0Anaheim Water Recycling Demonstration Facility
The City of Anaheim selected MWH to plan and design a new water recycling facility to demonstrate how urban developers can utilize low impact development features in any location. The Water Recycling Demonstration Facility (WRDF), which consists of a Membrane Bioreactor (MBR), ozonation and UV disinfection, illustrates how six separate water sustainable features are used […]
-
0Anaheim Water Recycling Demonstration Project
The City selected MWH, now part of Stantec, to design the Water Recycling Demonstration Facility (WRDF), which will consist of a membrane bioreactor system, ozonation and UV disinfection. The WRDF was built in two phases with an ultimate treatment capacity of 100,000 gpd. Phase 1 of the project consisted of designing and building a 50,000 […]
-
0Arrow Lakes Hydroelectric Project
MWH provided comprehensive engineering, design and services during construction for the award-winning Arrow Lakes Hydroelectric Project, a design-build project that included a 170 MW powerhouse in southern British Columbia, Canada. Located on the Columbia River, the project was constructed on the north side of the existing Hugh Keenleyside Dam, which was completed in 1969 without […]
-
0Aurora Prairie Waters Project
MWH was responsible for planning, preliminary design, final design and services during construction, PLC programming, startup and commissioning and warranty support for the $160 million, 50 mgd raw water conveyance system as part of the Aurora Prairie Waters project. The conveyance system includes 34 miles of raw water conveyance piping with a diameter of 60 […]
-
0Blue Buttes Special Waste Landfill
The project involved conducting site characterization investigation which included completing geological and hydrogeological investigation and testing to determine suitability for landfill siting in compliance with North Dakota regulations.
-
0Brightwater Wastewater Conveyance
In response to rapid population growth in King and Snohomish counties, a new regional wastewater treatment plant was designed to treat an average of 36 million gallons of wastewater a day, impacting nearly 190,000 people. King County selected a joint venture including MWH to provide final design services for the conveyance portion of the new […]
-
0Camrosa Water Reclamation Facility Disinfection Study
The Camrosa Water Reclamation Facility (CWRF) provides recycled water for crop irrigation but was limited in the volume of water it could produce because the chlorine contact basins, which pre-dated the rest of the treatment facility, were not large enough to meet the default regulatory minimum contact times (CT). MWH, now part of Stantec, developed […]