Argentina
Showing 2 from 2 Items
-
0Los Caracoles Hydroelectric Facility / Instalación Hidroeléctrica Los Caracoles
Meeting Argentina’s Growing Energy Needs MWH managed the detailed design of the civil works for the Los Caracoles Hydroelectric Facility, which will produce 705 GWh/year to meet the energy needs in the Province of San Juan in western Argentina.
-
0Yacyreta Hydroelectric Project
A Mega Project with Multiple Benefits MWH led a four-country consortium that conceived, planned, designed and managed construction of the $6 billion Yacyreta Multi-Purpose Hydroelectric Project, which provides 3,200 MW of power, navigation, flood control, irrigation and water supply to a large region of Latin America. Located on the Paraná River on the border between […]