Technical Assistance and Supervision for Erzurum Water and Wastewater Project
You are hereHome >All Projects > Technical Assistance and Supervision for Erzurum Water and Wastewater Project
This project is part of the process of Turkey’s accession to the European Union. By enabling Turkey to achieve a high level of environmental protection and compliance with the EU water sector directives, the project aims to support the implementation of the EU water policy in Turkey, as an EU candidate country. All the activities delivered under the project were fully in line with the EU water policy, and the respective commitment of the Turkish government to follow the relevant EU policies and legislation in the water sector. Main activities performed in the project, which is co-financed by European Union and the IPA Programme:
Technical assistance for the rehabilitation of the existing water distribution system
Capacity building and modernization of the Erzurum Water and Sewerage Authority
Supervision of Erzurum Wastewater Treatment Plant and Creek Rehabilitation Works Contract
Technical Assistance /or rehabilitation of the Existing Water Distribution System
Data collection
Assessment of existing water supply and distribution system and drinking water project prepared in 2005
Environmental impact assessment issues
Feasibility study and cost/benefit analysis
IPA application form
Determination of water losses by conducting leak detection and illegal connection surveys
Rehabilitation plan for the water distribution network and detailed design
Technical assistance during tendering and evaluation
Capacity Building and Modernization of Erzurum Water and Sewerage Authority (ESKI)
Preparation of training needs assessment report and modemization plan
Performance of trainings and modernization of ESKI
Preparation of sludge management plan and sludge marketing plan
Developing guideline and procedures for operation of ESKI
Conducting study tour
Technical assistance for the improvement in financial and operational performance of ESKI
Review, verification and preparation of supply tender documents
Supervision Activities
Pre-construction, construction and post-construction activities of the “Construction of WWTP and Wastewater Collectors including Creek Rehabilitation in Erzurum Greater Municipality” project including:
Supervision of Creek Rehabilitation and Collector Works as part of FIDIC Yellow Book Contract including replacement of 24.8 km old wastetwater network, construction of 586 house connections, construction of sewage pumping station with 35l/s capacity, construction of 4.5 km collector line, construction of 2.47 km rising main, replacement of 670 m box culvert
Supervision of construction of first stage of Erzurum wastewater treatment plant as part of FIDIC Yellow Book Contract.