Client: CPG
Background:
The Marmaray Project in Turkey covered 4 stations and 3 ventilation buildings along the rail tunnel spanning over 13 km with one section of the tunnel constructed by immersed tube method crossing under the sea between Sirkeci and Üsküdar stations from the European side to the Asian side.
MWH was engaged by CPG to provide Systems Assurance and Electromagnetic Compatibility support to the project by developing an SA Plan to provide assurance of the system’s safety and reliability through the identification and management of hazards and the assessment of the system’s performance.