Wanlip STW is a 900,000 PE works serving Leicester. Under AMP4 Severn Trent are making significant Investments in the improvement of Wanlip Sewage Treatment Works. The planned work is phased over several stages between 2005 and 2010. Starting with a Capital Maintenance Works Severn Trent plan to improve and expanded the Wanlip site.

    Location: Wanlip, Leicester LE7, United Kingdom
    Market Sector: Water & Wastewater
    Status: Complete
    This investment is being driven by several factors:
    • Tightening discharge consent for ammonia to be applied by March 2010 in response to a Fisheries Directive.
    • A new discharge limit for Phosphorus to be applied by December 2008.
    • Capital maintenance of existing assets based on risk scoring of operability and maintainability, as assessed by Severn Trent.
    • Odor nuisance (inlet works and sludge processes) Sludge Improvements Health & Safety Improvements.

    Mechanical Equipment:

    • Chemical Dosing Unit.
    • Liquor Treatment Plant.
    • RAS Booster Pumps.
    • Aeration Lanes.
    • Desludging Pumps.
    • RAS Pumps.
    • Balance Tank.
    • Final Settlement Tanks.
    • 75KW Surface Aerator.

    Chemicals:

    • Ferric Sulphate.
    • Caustic Soda.

    Phase 1 - Capital investment Works:

    • Activities involved replacing valves, pipework and primary de-sludging pumps in the Old Works.

    Phase 2 – Centrifuge Centrate Liquor Treatment Plant:

    • A dual stream Sequenced Reactor liquor treatment plant to remove 50% of ammonia load.
    • Removal of Aeration Lanes in both the Old and New Works.

    Phase 3 – Ferric Sulphate Chemical Dosing Plant:

    • Installation of Lintott Series 5 Dosing Rig.
    • 120m³ Chemical Storage.
    • Construction of a secondary dosing line to the Inlet Works (New works) and Pre-Interstage Pump Channel (Old works).

    Phase 4 – Old Works Settlement Tank Capacity:

    • Four 2.5m high sidewall FST increasing surface area capacity of FST by 51% to 7947m.
    • The new tanks will treat one third of the current ‘Old’ works flow and will return RAS at one third of current RAS flow.
    • Refurbishment of existing RAS Pumping Station.
    • Construction of a wash water Pumping Station.

    Phase 5 - Conversion of Activated Sludge Plant to achieve Biological Nutrient Removal:

    • To comply with the requirements of the Urban Wastewater Treatment Directive and Fisheries Directive it was is planned to convert the Wanlip’s ASP’s to achieve Biological Nutrient Removal.