The primary purpose of this task order was to develop a project interpretive plan for the Port Allen Lock project, a comprehensive guide for the project’s interpretive services and outreach program (ISOP). In addition, several high priority interpretive features listed in the plan were designed, fabricated and delivered to the project.
The secondary purpose of this task order was to perform a review of the draft project master plan documents prepared by another contractor for the Port Allen Lock in 2000, but never approved and implemented. The draft master plan was reviewed to evaluate what changes are required to produce a conceptual plan for short- and long-term development and operational management of both man-made and natural resources of the project. The review resulted in a detailed plan of action for revision and update of the draft project master plan to ensure that the plan reflects current project conditions and is consistent with USACE NRM program guidance.
Project Highlights
The level of service provided by MWH to the Corps with this contract was unmatched compared to other contractual experiences we've managed in the past. All deliverables were provided on time in sealed packages and delivered face to face with professionalism. It was demonstrated to us through final design and installation that the products were high quality and built for the long run.
- MVN Operations Division (GIWW Operations Management)